Demolition and cutting attachments are primarily designed for shearing and breaking down reinforced concrete components, metal structures, and construction waste. Given that different models vary significantly in terms of shearing capacity, structural strength, operating pressure, and hydraulic flow requirements, it is essential to select equipment suited to the specific working conditions-taking into account the excavator's tonnage, the attachment's own weight, and the type and thickness of the materials to be processed. During installation, particular attention must be paid to connecting pins, lug plates, locking mechanisms, and mounting bolts to ensure a secure connection between the attachment and the excavator's working assembly; this prevents the attachment from detaching or sustaining structural damage due to loose connections or dimensional mismatches. Furthermore, verify that the hydraulic line connections, operating pressure, and flow requirements are compatible, and inspect hydraulic hoses, fittings, and seals for any signs of damage or leaks to ensure the hydraulic system functions correctly during cutting operations. Before commencing work, examine the condition of the cutting edges, shear blades, moving joints, and hydraulic cylinders, ensuring that no components exhibit visible cracks, deformation, or abnormal clearances. For equipment that is being installed for the first time or has recently undergone repairs, perform operational tests in accordance with the manufacturer's specifications to confirm that the opening/closing, shearing, and control functions are operating properly before putting the unit into service. During operation, select appropriate cutting positions based on the shape, size, and strength of the material. Avoid exceeding the equipment's rated capacity by attempting to process excessively thick steel plates, oversized rebar, or other materials that are too difficult to shear. Additionally, do not use the cutting attachment to forcibly pry large structural components, as this could lead to chipped cutting edges, deformed pins, or cracks in the main structure.
The use of demolition and cutting attachments also requires a strong focus on site safety, the sequence of demolition, and routine maintenance. Construction demolition work often entails risks such as falling components, flying concrete debris, sudden structural instability, and damage to underground utility lines. Therefore, prior to construction, it is necessary to assess the structural condition of the target objects, verify the status of utility systems-such as water, electricity, and gas-and establish a demolition sequence in accordance with a specialized construction plan. For load-bearing walls, beams, columns, bridge components, and other critical structural elements, cutting must not be performed without a prior assessment of structural stability. Operators must maintain effective communication with on-site supervisors and ensure that no unauthorized personnel remain within the work zone. During operation, avoid sudden pressure spikes, off-center shearing, and continuous impact to prevent the attachment from being subjected to abnormal loads. If difficulties in cutting, mechanical jamming, abnormal vibration, excessive hydraulic oil temperature, or fluid leaks occur, operations must cease immediately; work may only resume after the faults have been rectified. When clearing jammed material, replacing blades, or performing maintenance, the attachment must be placed in a stable position, the power source shut down, and-in accordance with the equipment manual-the hydraulic power isolated and residual pressure released. It is strictly prohibited to disconnect hydraulic hoses or place any part of the body between moving components while the system is under pressure. Routine maintenance should include regular inspections of blade wear, pin-joint clearances, lubrication status, welded joints, and hydraulic seals; components that have reached their wear limits must be replaced promptly. By ensuring proper equipment selection, strictly adhering to safety operating procedures, managing cutting loads effectively, and implementing regular maintenance, one can minimize equipment failures and operational risks, guarantee the long-term stable performance of demolition and cutting attachments, and enhance both efficiency and safety in demolition projects.